13 December 2023
What’s New
- New Declaration ID invoices will have a note about invoice validity until 12/31/2023 (due to the upcoming fee increase)
30 November 2023
What’s New
- Performance optimizations:
- Product and design search runs faster than before
- Declaration ID Invoice template updated with additional clarification content
- New Declaration Fee payment module:
- We have migrated to a new PayPal Payment Processing system for increased security and reliability. Additional information will be required when paying fees with a credit card.
14 November 2023
What’s New
- New specifications available for qualification
- Gaming Audio Profile (GMAP) 1.0
18 October 2023
Bug Fixes
- Fixed: Occasional errors when uploading extra-long test reports into projects with required Testing.
19 September 2023
What’s New
- New specifications available for qualification
- Hands Free Profile (HFP) 1.9
- Mesh Protocol (MESH) 1.1 (formerly MESH Profile)
- Mesh Model (MMDL) 1.1
- Mesh Binary Large Object Transfer Model (MBT) 1.0
- Mesh Device Firmware Update Model (DFU) 1.0
- Ambient Light Sensor NLC Profile (ALSNLCP) 1.0
- Basic Lightness Controller NLC Profile (BLCNLCP) 1.0
- Basic Scene Selector NLC Profile (BSSNLCP) 1.0
- Dimming Control NLC Profile (DICNLCP) 1.0
- Energy Monitor NLC Profile (ENMNLCP) 1.0
- Occupancy Sensor NLC Profile (OCSNLCP) 1.0
- Performance optimizations:
- Advanced Search filters will apply only after clicking on the Search icon
- Consistency Check runs up to 10 times faster
5 September 2023
What’s New
- BAP: Errata Correction 19096 is available for qualification
23 August 2023
Bug Fixes
- Fixed our use of a third-party service: improved overall load time for APAC region
- We improved the backend: Saving draft projects with integrated QDIDs is faster than before
26 July 2023
Bug Fixes
- Optimized: Consistency Check performance to prevent occasional reporting of "No Inconsistencies" prior to completion of the consistency check
- Fixed: Cache reload issue impacting the Step-by-Step Assistance guide
29 June 2023
What’s New
- TCRL 2023-1 is now available for qualification
- Starting this TCRL release, Components that require a Core Configuration will need to support all layers required for that configuration
- New specifications available for qualification
- Device Information Service (DIS) 1.2
- Elapsed Time Service (ETS) 1.0
- Generic Health Sensor Profile (GHSP) 1.0
- Generic Health Sensor Service (GHSS) 1.0
Bug Fixes
- Fixed: Consistency Check invalids were triggered for Controller layers when creating Host Subsystem
19 April 2023
Bug Fixes
- Fixed: Some profile ICS selections from integrated QDID were not copied to the new design
4 April 2023
What’s New
- New specifications available for qualification
- Electronic Shelf Label Profile (ESLP) 1.0
- Electronic Shelf Label Service (ESLS) 1.0
22 March 2023
Bug Fixes
- Fixed: Incorrect spec name displayed for listings implementing Core 5.4 specification
7 February 2023
What’s New
- TCRL 2022-2 is now available for qualification:
- Core Specification Version 5.4 available for qualification
- TCRL version displays for each layer on ICS Details page
25 January 2023
What’s New
-
Qualifying with a Component assessed to an older TCRL:
-
Unmodified layers integrated from a Component can stay on their original TCRL version
-
You will not need to update layer's ICS selections to account for changes since the original Component was qualified/assessed unless one of the following is true:
- A layer has a new ICS representing Expedited Errata
- Integrated layer is using deprecated or withdrawn specification version
- You are making modifications or upgrading the layer
- Please see our updated article about Qualifying With a Component to learn more
-
- Step-by-step Assistance will preselect layers that are mandatory to meet the requirements of the product type selected by the user for their project
10 January 2023
What’s New
- TSE hyperlinks on the References page updated to go directly to the new Errata system
13 December 2022
What’s New
- Additional information is included in emails confirming invoice payments by releasing Declaration IDs.
15 November 2022
What’s New
- Launch Studio Terms of Use updated to clarify Declaration ID validity period. Learn more
Bug Fixes
- Fixed: Occasional errors when uploading multiple test evidence documents
31 October 2022
What’s New
- We are asking for feedback about the new Step-by-Step Assistance tool
18 October 2022
What’s New
- Listing Search by integrated component is now available
- Visual improvements within the Step-by-Step Assistance flow
Bug Fixes
- Fixed: Some old draft projects could not be removed by their owners
- Fixed: Deprecation & Withdrawal alerts display for integrated QDIDs
4 October 2022
What’s New
- We have launched the “Step-by-Step Assistance” pilot. Learn more
20 September 2022
What’s New
- New specifications available for qualification
- GATT Profiles & Services
- ACP 1.0
- ACS 1.0
- GATT Profiles & Services
24 August 2022
Bug Fixes
- Fixed: PACS TSE 19317 - Remove D&W Information until BoD Approval
- Fixed: CSIS TSE 19318 - Remove D&W Information until BoD Approval
- Fixed: CSIP TSE 19319 - Remove D&W Information until BoD Approval
- Fixed: BAP TSE 19320 - Remove D&W Information until BoD Approval
12 July 2022
What’s New
- New specifications available for qualification
- LE Audio Specifications
- PBP 1.0
- LE Audio Specifications
Bug Fixes
- Fixed: Spec versions were not displayed for some supported layers on the Listing Details page
28 June 2022
What’s New
- TCRL 2021-2 now available for qualification
- New specification versions available for qualification
- Traditional Profiles
- A2DP 1.4
- LE Audio Specifications
- BAP 1.0.1, CSIP 1.0.1, CSIS 1.0.1, PACS 1.0.1
- Mesh Specification
- MCDB 1.0.1
- Traditional Profiles
- Adopted Errata available for qualification
14 June 2022
What’s New
- Listing Search enhancements:
- Listings in search results now display the integrated Component QDIDs if they were used in the corresponding qualification.
- New specifications available for qualification
- LE Audio Specifications
- HAP 1.0, HAS 1.0, TMAP 1.0
- LE Audio Specifications
17 May 2022
What’s New
- Listing Search enhancements:
- Search by ICS item is now available as an Advanced Search filter
10 May 2022
What’s New
- Presentation improvements for specification versions:
- Selected specification versions will be displayed at the top of ICS Selection page
- Users will be prompted to confirm their ICS selections in case of different versions selected within the same specification
- Profile versions are now displayed for Supported Layers on the Listing Details page
- Listing Spec Name is visible on Review and Submit page prior to qualification submission
Bug Fixes
- Fixed: Blank pop-ups displayed when trying to reference QDIDs that use withdrawn specifications
19 April 2022
What’s New
- Adopted BAP Expedited Erratum 18524 is available for qualification
- We updated the backend for credit card processing to improve data security
- Experience improvements:
- "Back to top" button added to ICS Selection page
- 'Spec Name' filter updated for Listing Search
5 April 2022
What’s New
- Support of BPP layers merge:
- Searching for BPP layer will return listings that support either active BPP or ended BPP 1.0
Bug Fixes
- Fixed: Members were blocked from submitting subsets for existing listings using legacy Declaration IDs.
- Fixed: Incorrect withdrawal date displayed in D&W alerts for listings affected by future withdrawals.
29 March 2022
What’s New
- New specifications available for qualification
- LE Audio Specifications
- CAP 1.0, CAS 1.0
- LE Audio Specifications
22 March 2022
What’s New
- Support of BPP layers merge:
- When integrating QDID with the obsolete BPP 1.0 or when importing BPP 1.0 ICS from .pts and .bls files into a new qualification, the ICS selections will be automatically made in the correct BPP layer
- When integrating QDID with the obsolete BPP 1.0 or when importing BPP 1.0 ICS from .pts and .bls files into a new qualification, the ICS selections will be automatically made in the correct BPP layer
Bug Fixes
- Fixed: D&W alert about withdrawn specification was not visible on Listing Details page for listing owner
8 March 2022
What’s New
- Improving qualification requirements alignment to the published ICS documents:
- BPP 1.2 layer short name updated to BPP
- Former BPP layer renamed to BPP 1.0 and no longer available for new qualifications
Bug Fixes
- Fixed: Bulk product import didn't work correctly without optional product Category
- Fixed: Incorrect design names were applied to combined QDIDs of imported projects
- Fixed: Listing transfer - incorrect last name displayed for primary contact
- Fixed: Invoice payment failed in case of a very long Attn field value
22 February 2022
Bug Fixes
- Fixed: SDAP layer should not be available for qualification
- Fixed: Ability to Add Products and Create Subsets from "My Listings" view
- Fixed: EPLs were not displayed in the "Company Listings" view on the Manage Listings page
- Fixed: "Expired TCRL" alert was duplicated on the Draft Project page
8 February 2022
What’s New
- Improving guidance to help ensure correct qualifications when using complementary subsystems
- Projects with alerts about a complementary subsystem not present will go through additional review to complete their qualification process.
25 January 2022
What’s New
- TCRL 2021-2 now available for qualification
- New specification versions available for qualification
- GATT Profiles & Services
- BLP 1.1.1, BLS 1.1.1
- BMS 1.0.1
- CGMP 1.0.2, CGMS 1.0.2
- GLP 1.01, GLS 1.0.1
- IDP 1.0.1, IDS 1.0.1
- PLXP 1.0.1, PLXS 1.0.1
- RCP 1.0.1, RCS 1.0.1
- GATT Profiles & Services
- Improving guidance to help ensure correct qualifications when using complementary subsystems
- Launch Studio will display a warning within draft projects if a complementary subsystem is not present.
- PTS test evidence can be automatically uploaded from PTS to Launch Studio
Bug Fixes
- Fixed: TSE 18166 - ICS consistency check invalid item: MPS 1/3
- Fixed: ICS Import and Project import functionality
11 January 2022
What’s New
- Product Listing Search updated to provide more accurate results when searching for product names and model numbers
14 December 2021
What’s New
- Membership status visibility:
- Listing Details page now includes information about the membership status of the company that owns the qualification
- A warning will be provided within draft projects when referencing or integrating QDIDs owned by no longer active members
- Please see our Membership Status article to learn more
Bug Fixes
- Fixed: Incorrect spec name displayed for some listings with subsets
- Fixed: AVRCP ICS selections and Consistency Check rules to remove deprecated minor versions
16 November 2021
What’s New
- Listing owners can now request product withdrawal directly from the Listing Details page. This capability can be used instead of submitting a support request
- Please see our updated Product Listing Error Correction article to learn more about this new functionality
Bug Fixes
- Fixed 4.0 HCI layer: TSE 17457 - Launch Studio incorrectly reporting consistency check failure
- Fixed 2 LL and 1 GATT test cases displayed incorrectly in generated test plans: LL/DDI/SCN/BV-33-C, LL/DDI/SCN/BV-34-C, and GATT/SR/GAW/BV-11-C
- Fixed issue with products removed before submission still showing up in Listing Search
19 October 2021
What’s New
- Inter-Layer Dependency column will be displayed on ICS pages
- Not all layers will have the data populated up-front; it will be filled in incrementally
Bug Fixes
- Fixed: ICS selections and Consistency Check rules to align with the published ICS Document for the following layers:
- HID layer; added table 15
- HDP layer; added ICS items 3/12, 4/1a, 4/1b, 10/1a, 10/1b
14-15 October 2021
Bug Fixes
- Fixed: ICS selections to align with the published ICS Document for the following layers:
- HPS layer; added tables 3, 4, and 5
- CPS layer; removed table 0a, added tables 4 and 5
- CPP layer; removed table 0a, added tables 5, 12, and 14
- CTS layer; added tables 4 and 5
- GLS layer; added table 9
6 October 2021
What’s New
- Improving user experience when working with ICS selections:
- We added the ability to select all mandatory ICS items identified by consistency check with one click
- Improving guidance to help ensure your test plan is accurately documented
- Launch Studio will display a warning if provided test evidence doesn’t include reports according to test platform requirements
- Please see our Test Plan Validation Release Notes for a complete list of test plan validation features
- Notification banners can now be closed by the users
Bug Fixes
- Fixed: ICS selections and consistency checks for HID 1.1 layer; added table 14 to align with the published ICS Document
- Fixed: Consistency Check not reporting an error for multiple ICS selections where only one ICS item was required
21 September 2021
What’s New
- New specifications available for qualification
- LE Audio Specifications
- ASCS 1.0, BAP 1.0, BASS 1.0, PACS 1.0
- Mesh Specification
- MCDB 1.0
- LE Audio Specifications
15 September 2021
Bug Fixes
- Fixed: Manage Listings and Draft Project pages failed to load for some users
- Fixed: ICS selections and consistency checks for 3DSP layer; reintroduced table 0, added tables 6, 7, 8, 9, 10, 11 to align with the published ICS Document
30 August 2021
Bug Fixes
- Fixed: ICS selections and consistency checks for GAVDP layer; added tables 4 and 5 to align with the published ICS Document
24 August 2021
What’s New
- Improving user experience when working with ICS and layers:
- All mandatory Core layers will be preselected based on the qualification Product Type
17 August 2021
What’s New
- Improving user experience when working with ICS and layers:
- Consistency Check hyperlinks updated to target specific ICS items
- Simplified display of layers on Project Basics page for integrated QDIDs
- Improving our communication with users within Launch Studio:
- Some users will be prompted to rate their qualification experience upon completion
Bug Fixes
- Fixed: Certain ICS selections were not copying over from integrated QDIDs
- Fixed: Referenced QDID disappeared for some projects going through Listing Correction
- Fixed: Incorrect subject line for emails about Listing Transfers
27 July 2021
What’s New
- Expanding Listing Transfer self-service capabilities:
- Members within the same company can now send listing transfer requests to listing owners
- Please see our Listing Transfers article to learn more about this new functionality
- Providing better visibility into expiration dates for unused Declaration IDs:
- Users will be sent emails as DIDs near expiration.
Bug Fixes
- Fixed: Product listings were being added immediately after import for projects under BQA review
13 July 2021
What’s New
- TCRL 2021-1 now available for qualification
- Core Specification Version 5.3 available for qualification
- Legacy Test Case IDs no longer included in Test Plans generated for projects using the new TCRL
- Improving user experience when working on ICS Selections
- Select all option available for each ICS table
- Page content updated to clarify steps and resources for consistent ICS selections
Bug Fixes
- Fixed: Bulk product import not working for projects with no required testing.
- Fixed: For completed qualifications, product listings were going live immediately after import
7 July 2021
Bug Fixes
- Fixed: Referenced QDIDs not saving for projects with required testing
- Fixed: Product Category not displaying on Product Declaration and Review & Submit pages
1 July 2021
What’s New
- When adding products to draft projects, users now have an option to import products in bulk
- Please review our updated article about Adding a Product to learn more
- Improving user experience when working on qualifications with required testing
- Consistency Check Invalids are now grouped by layers
- Previously uploaded Reference Integration Notes (RINs) can be removed from draft or unlocked projects
- Providing better visibility into expiration dates for unused Declaration IDs:
- Expired Declaration IDs will be reflected in a separate table on the Manage Declaration IDs page
15 June 2021
What’s New
- Expanding Listing Transfer self-service capabilities:
- Primary Contacts can now transfer listings between the users of their company
- Please see our Listing Transfers article to learn more about this new functionality
- Improving guidance for suppliers:
- Reference Integration Notes (RIN) template added to Launch Studio
- Please see our article about Reference Integrations Notes to learn more
- Providing better visibility into expiration dates for unused Declaration IDs:
- Users can now see expiration dates on the Manage Declaration IDs page.
Bug Fixes
- Fixed: Unable to update Reference Integration Notes (RIN) for transferred projects
- Fixed: “Expired TCRL” alert missing on the Draft Projects page
2 June 2021
What’s New
- Listing owner can now transfer their listings to any user within their company
- Please see our Listing Transfers article to learn more about this new functionality
- When adding products to an existing qualification, you now have an option to import products in bulk
Bug Fixes
- Fixed: some End Product Listings (EPLs) were not displaying all referenced QDIDs
- Fixed: Add Product button was missing for some users
24 May 2021
What’s New
- Adopted MESH Expedited Erratum EE16350 is available for qualification
Bug Fixes
- Fixed: ICS selections and consistency checks for CGMP layer; added tables 4, 5, 6, 7, 16, 17, 18 to align with the published ICS Document
12 May 2021
Bug Fixes
- Fixed: ICS selections and consistency checks for PBAP layer; added tables 16, 17, 21, 22, 23 to align with the published ICS Document
- Fixed: Consistency checks for HSP layer; incorrect dependency invalid was triggered in some cases.
- Fixed: TSE 16903 - Invalid consistency error in MPS
- Fixed: ICS selections and consistency checks for CGMS layer; added tables 10, 11 to align with the published ICS Document
20 April 2021
What’s New
- We improved the backend, “Import ICS” operation is faster than before
Bug Fixes
- Fixed: AVDTP 16/1 and AVDTP 16/2 unselecting in some unlocked listings
- Fixed: invalid ICS items occasionally saved for some listings after QDID integration or TCRL upgrade process
- Fixed: ICS selections and consistency checks for PXP layer; added tables 5, 8, 10 to align with the published ICS Document
- Fixed: TCIDs for RFPHY layer that didn’t match the approved qualification test requirement documents
6 April 2021
What’s New
- Improving our communication with users within Launch Studio. We now provide:
- Release Notes
- Feedback system
- Improving guidance on correct qualifications with required testing.
- Launch Studio will limit the use of the ‘previously Qualified Design used in this Qualification’ field to Component product types only.
Bug Fixes
- Fixed: BLP Table 0b and ICS Item 0b/1 missing in TCRL 2018-2
- Fixed: ICS selections and consistency checks for A2DP layer; added tables 8, 9, 12, 13 to align with approved qualification test requirement documents
- Fixed:
30 March 2021
What’s New
- New specifications available for qualification
- LE Audio Specifications
- CSIP 1.0, CSIS 1.0
- LE Audio Specifications
24 March 2021
What’s New
- We improved the backend, when viewing a listing from ‘My Listings’ or ‘Search’ pages load faster than before
- Improving guidance to help ensure your test plan is accurately documented. Launch Studio will display warnings if the following criteria are found in a test plan
- Test case verdict is not one of the expected values: Pass, Inconclusive, Fail, Waived, Referenced, Not Required
- “Referenced” test case verdict when qualifying a “Component (Tested)” product type
- Three year period has expired for the Component QDID # input for “Referenced” test case verdict
- Please see our Test Plan Validation Release Notes for a complete list of test plan validation features
16 March 2021
What’s New
- New specifications available for qualification
- LE Audio Specifications
- MCP 1.0, MCS 1.0
-
CCP 1.0
-
TBS 1.0
- LE Audio Specifications
12 March 2021
Bug Fixes
- Fixed:
- TSE 16691 - WSP/COL/WSD/BV-30-I not generated in Test Plan
- TSE 16678 - Test Plan generates the same name for “Test Case ID” and “Legacy test Case ID” for BPP
- TSE 16186 - If LL 9/30 is not supported while LL 9/31 or LL 9/32 are not supported, the test plan should not generate LL/CIS/MAS/BV-24-C or LL/CIS/SLA/BV-18-C test cases
-
TSE 14967 - C.8 of Table 7 for AVRCP 7/38b should be excluded for AVRCP v1.5
- TSE 11525 - Invalid Consistency Error in CTN profile
2 March 2021
What’s New
- New specifications available for qualification
- LE Audio Specifications
- MICP 1.0, MICS 1.0
- LE Audio Specifications
25 February 2021
What’s New
- New Launch Studio Terms of Use go into effect, learn more about the changes here
- We improved the backend, ‘draft project’ page loads faster than before
Bug Fixes
- Fixed:
9 February 2021
Bug Fixes
- Fixed: some users were not able to attach DIDs to their draft projects to complete qualification
- Fixed: some listings’ ‘Specification Name’ was incorrectly calculated
- Fixed:
- TSE 16499: GAP/SEC/SEM/BI-04-C, GAP/SEC/SEM/BI-08-C is generated in the Test Plan xls even though GAP 2/7a is not selected in the ICS layer
- TSE 16523: OPP/CL/OPH/BV-07-I is not generated in the test plan
- TSE 16532: GAP/SEC/SEM/BI-11-C, GAP/SEC/SEM/BI-12-C is generated in the Test plan xls without selecting GAP 2/7d in the ICS layer
29 January 2021
Bug Fixes
- Fixed: some listings were incorrectly categorized as using an A2DP or HFP specification version scheduled for deprecation on 1 February 2021
- Fixed:
26 January 2021
What’s New
- When viewing your company’s publishing listing, you can now see who owns the listing
Bug Fixes
- Fixed:
- TSE 16446 - IDP/COL/RCP/BV-06-I not generated in the Test Plan
- TSE 16444 - CGMS/SEN/CN/BV-04-C not generated in the Test Plan
- TSE 16427 - PLXS/SEN/SD/BV-02-C not generated in the Test Plan
- TSE 16428 - Issue with PLXP/COL/BAS/BV-02-I, PLXP/COL/PLXSD/BV-23-I and PLXP/COL/CTS/BV-01-I in the Test Plan
- TSE 16429 - Test Plan generates the same name for “Test Case ID” and “Legacy test Case ID”
- TSE 16430 - Test Plan generates the same name for “Test Case ID” and “Legacy test Case ID”
- TSE 16431 - ESS/SEN/DES/BV-05-C and ESS/SEN/DES/BV-07-C not generated in the Test Plan
- TSE 16394 - 2 Testcases repeated in TPG
- TSE 16342 - Consistency check fails at ATT ICS
- TSE 16344 - Consistency check fails at ESP ICS
19 January 2021
What’s New
- New specifications available for qualification
- GATT Profiles & Services
- ATP 1.0
- CTES 1.0
- GATT Profiles & Services
12 January 2021
What’s New
- Discontinued support of the Qualification Upgrade Program (QUP)
28 December 2020
Bug Fixes
- Fixed: approx. 150 consistency checks from ATT, GAP, GATT, & SM layers were not triggering for projects using TCRL 2019-2
22 December 2020
What’s New
- TCRL 2020-1 now available for qualification
- New specifications available for qualification
- LE Audio Specifications
- AICS 1.0
- MICP 1.0, MICS 1.0
- VCP 1.0, VCS 1.0
- VOCS 1.0
- GATT Profiles & Services
- BLP 1.1, BLS 1.1
- DTP 1.0, DTS 1.0
- PAMP 1.0, PAMS 1.0
- LE Audio Specifications